Ongoing

Project Partner Water Environment and Life (WEL) Nepal

Project Location Bhadrapur

Project Start Date Mar 2026

Description

EcoConcern has been undertaking the project for the construction, installation, testing, and commissioning of Healthcare Liquid Waste Treatment Plant (HCLW-TP) at Provincial Hospital Bhadrapur. It has worked on the design, drawings, Bill of Quantities (BOQ), and technical specifications preparation. 
The scope of works include:

  • Site clearance and earthworks
  • Construction of collection chamber
  • Anaerobic Baffled Reactor (ABR)
  • Horizontal Flow Constructed Weltand (HFCW)
  • Polishing Pond
  • Interconnecting pipelines and appurtenances
  • Manholes, chambers, fencing and site development
  • Testing of effluent and commissioning