Ongoing

Project Partner Dugar Edibles Pvt. Ltd.

Project Location Duhabi, Sunsari

Project Duration Dec 2024 to Apr 2025

Description EcoConcern has been working with Dugar Edibles Pvt. Ltd., located at Duhabi, Sunsari for the design, installation, testing and commissioning of wastewater treatment plant (WWTP) of semi-mechanical system with 100 KLD capacity. The scope of work includes:
1. Detailed Design and Drawings

  • Detailed engineering design of a WWTP
  • Process flow diagrams and layout plans
  • Integration with existing production facilities
2. Installation and Commissioing
  • Installation of the system (including civil works)
  • Supervision of installation works
  • Commissioning and start-up assistance
  • Training to operators